|
Top Story
Relief and joy as new float line is commissionedAfter a gruelling 18 months of intensive construction and development, our new high quality float glass line was successfully commissioned on 20 April, at PFG in Springs.
Excellent teamwork saw a group of experienced glassmakers from PFG and Guardian take turns to guide the new ribbon along the line, using long steel rods through side portholes to lift the ribbon´s thin over the rollers. The team was successful at first attempt. Once the ribbon was established the volume of glass feeding through the line was increased to widen the ribbon so that the residue tin and irregularities could work their way out of the ‘system´. 27.08.2007, PFG News material on the Site is copyright and belongs to the Company or to its third party news provider, and all rights are reserved. Any User who accesses such material may do so only for its own personal use, and the use of such material is at the sole risk of the User. Redistribution or other commercial exploitation of such news material is expressly prohibited. Where such news material is provided by a third party, each User agrees to observe and be bound by the specific terms of use applying to such news material. We do not represent or endorse the accuracy or reliability of any of the info contained in any news or external websites referred to in the news.
|
Search News
INFO
Category
News by language
Company Profile
NEWSLETTER
Services
|
Advertisement
|